# Plan the production of your construction projects

Sitedrive brings all your schedules and methods into one tool and combines them into one production plan: always up-to-date and actually used on-site.

Language: en
Canonical: https://sitedrive.com/production-planning

##### CONSTRUCTION PRODUCTION PLANNING SOFTWARE

## **Finally – one schedule everyone actually follows**

Sitedrive brings all your schedules and methods into one tool: All synced, always up-to-date and actually used on-site.

[See Sitedrive in Action](https://sitedrive.com/get-started)

![Caverion\_logo](https://sitedrive.com/hubfs/Caverion_logo-w176.png)

![fira-logo](https://sitedrive.com/hubfs/fira-logo-w139.png)

![Mangrove logo](https://sitedrive.com/hubfs/Mangrove%20logo-w298.png)

![skanska-logo](https://sitedrive.com/hubfs/skanska-logo-w217.jpg)

![Saint-Gobain\_logo.svg](https://sitedrive.com/hubfs/Saint-Gobain_logo.svg-w165.png)

![jmalm-logo](https://sitedrive.com/hubfs/jmalm-logo-w212.png)

![vrp\_logo](https://sitedrive.com/hubfs/vrp_logo-w151.png)

![hartela\_logo\_mv](https://sitedrive.com/hubfs/hartela_logo_mv-w243.png)

![bonava-logo](https://sitedrive.com/hubfs/bonava-logo-w91.jpg)

![AF Gruppen](https://sitedrive.com/hubfs/Customer%20logos%20\(500%20x%20100%20px\)%20\(2\)-w120.png)

![logo-backe](https://sitedrive.com/hubfs/logo-backe-w137.png)

![mittaviiva-logo](https://sitedrive.com/hubfs/sitedrive-mjwv1s-1-w255.webp)

![Betonmast](https://sitedrive.com/hubfs/Customer%20logos%20\(500%20x%20100%20px\)%20\(1\)-w120.png)

![tencon-logo](https://sitedrive.com/hubfs/tencon-logo-w132.png)

## **Why traditional scheduling tools fail on-site?**

If your schedule doesn't match reality, it's not a plan – it's wishful thinking. Here's what typically goes wrong:

### Schedules are fragmented

You're stuck updating Gantt, Excel, and the wall board – none of your schedules talk to each other.

### No buy-in from the crew

Site teams, project managers, and subcontractors all follow different versions of the plan, often conflicting with each other.

### Planning and editing takes too long

You spend days creating something that gets outdated as soon as construction starts. Adjusting tasks is too time-consuming.

 

## **Plan every phase of construction in one tool**

## Mix scheduling methods without duplicating work

**✓** Gantt, Line of Balance, or location-based scheduling – use what fits the situation.

**✓** All views are connected: update once, and it's reflected everywhere

**✓** No more juggling disconnected tools

[Watch Different-views-sitedrive](https://sitedrive.com/hubfs/Different-views-sitedrive.mp4)

## Spot scheduling mistakes before they hit site

✓ Switch between views to see gaps, overlaps, and other inefficiencies visually

**✓** Get a clear picture of how production flows

[Watch Overlaps & empty spaces](https://sitedrive.com/hubfs/Overlaps%20&%20empty%20spaces.mp4)

## **Create a credible production plan in 45-minutes  
**

**✓** Build reliable plans faster than ever

✓ Save work sequences to reuse in future projects

**✓** No more spending days on something crews won't use

[Watch Easy scheduling(library)](https://sitedrive.com/hubfs/Easy%20scheduling\(library\).mp4)

## Make sure everyone on-site follows the same plan

✓ Visual schedule shows crews what is happening, where, and when

✓ Everyone executes the same plan; no misunderstandings

![Highlighted apartment&time](https://sitedrive.com/hubfs/Highlighted%20apartment&time-w2000.png)

## **Make edits and adjustments on the spot** 

✓ Solve challenges together during weekly meetings.

✓ Collaborate easily with subcontractors and execute bottom-up planning.

[Watch Moving multiple wp at once](https://sitedrive.com/hubfs/Moving%20multiple%20wp%20at%20once.mp4)

## Features built together with actual jobsites

#### Location-based scheduling

#### Gantt

#### Line of Balance

#### Resource graph

#### Quantity-based scheduling

#### Lean & Takt supported

## See how Sitedrive has reduced construction times on real projects

## 45% faster apartment building project

[

**Read the case study**

](https://sitedrive.com/stories/case-coflow)  

## Interior phase completed in only 4 weeks

**[Read the case study](https://sitedrive.com/stories/interior-phase-reduced-by-8-weeks)**

  

![shape4-wht](https://sitedrive.com/hubfs/shape4-wht-w2000.webp)

## Get a demo of Sitedrive

Don’t just take our word for it – get a demo of Sitedrive and see how it helps you to reduce construction times.

[Get the Demo](https://sitedrive.com/get-started)
