Your schedule. Connected to everything.
Sitedrive's open API lets your tools talk to your schedule — and your schedule talk back. Build integrations, feed dashboards, and link your BIM models directly to live production data.
Integration showcase
Stop switching tabs. Start connecting systems.
Because Sitedrive's API is open, your engineers — and ours — can build integrations that fit exactly how you work.
Schedule visualization on your BIM model
Map IFC model spaces to Sitedrive locations and see your live production schedule directly on top of the 3D building model — color-coded by task status, updated in real time.
"This is possible when both applications provide capable and open APIs. Map IFC model spaces to Sitedrive locations, visualize location-based schedules directly on top of the information model."
Skanska engineer — Sitedrive's open API and Trimble ConnectProduction dashboards that update themselves
Pull live task-level data from Sitedrive into Power BI or Tableau. Build portfolio dashboards, track site performance, and monitor earned value — all from real production data, not estimates.

Materials that arrive when crews need them
Link Sitedrive's production schedule to your logistics and supply chain systems. From BIM model to takt schedule to site delivery — Every material is tied to a specific zone, floor and work window, tracked from order to reception.
On complex urban sites with constrained logistics, a late delivery doesn't just delay one task — it disrupts the whole rhythm. Sitedrive keeps your material flow in sync with your production flow.
What you can build
Five ways teams use Sitedrive's production data
Every piece of data Sitedrive captures is available via the API — task progress, resource assignments, location status, quality checks.
Situational awareness
Executive dashboards showing what's really happening across all sites — not what someone reported last week.
Financial management
Live work-in-progress reporting tied to actual task completion. Cash flow forecasting that reflects reality.
Quality management
Pull inspection data into live dashboards. Every check linked to a task and location — full audit trail for handover.
Resource management
Connect to HR and ERP systems for a single view of workforce demand vs. availability across your portfolio.
Logistics & materials
Schedule deliveries based on real production progress. Materials arrive when crews need them — not weeks early.
For your technical team
A real API, properly documented
Sitedrive's REST API exposes the full production data model. If you can build it, you can connect it.
Get started
Ready to connect your tools?
API access is included in the Enterprise plan and available on request for other plans.
Talk to us about what you're building — we're happy to help your team get connected.